The short answer
Reactive clay moves as its moisture content changes, so deck footings on clay need to be sized and set for the site, with posts and framing that suit the ground conditions and drainage that stops water pooling around them. Soils are classed under AS 2870 from A (little or no movement) to E (extremely reactive), and a Wagga engineering firm has written that M and M-D, moderately reactive clay, are the most common site classes in the Wagga Wagga area. Footing size and depth are set from the relevant standard or by an engineer for the site. Addan works this out at the measure-up and arranges an engineer when a deck needs one.
Wagga's soils
AS 2870 sorts sites into classes by how much the surface can move:
| Class | Soil | Surface movement |
|---|---|---|
| A | Mostly sand and rock | Little or none |
| S | Slightly reactive clay | 0 mm to 20 mm |
| M | Moderately reactive clay or silt | 20 mm to 40 mm |
| H1 | Highly reactive | 40 mm to 60 mm |
| H2 | Very highly reactive | 60 mm to 75 mm |
| E | Extremely reactive | More than 75 mm |
| P | Problem site (soft soils, fill, abnormal moisture) | Not applicable |
A "-D" suffix marks sites with deep-seated moisture change.
A Wagga engineering firm wrote in 2014 that M and M-D are the most common site classes around Wagga, because of moderately reactive red clay soils and high evaporation. That is a general pattern, not a rule for your block, and your lot may be in a different class. If you have a site classification for your house, have it ready when we measure up.
Wagga's climate adds to the movement. The Bureau of Meteorology's Wagga Wagga AMO station records a mean January maximum of 31.9 °C, an average of 20.7 days a year at or above 35 °C, and mean annual rainfall of 571.6 mm. High evaporation is one of the reasons the engineering firm gave for the common site classes.
Why it matters for a deck
A deck sits on many separate footings. When the clay under some of them moves more than others, the frame can be pushed out of level. Signs include:
- boards that slope or dip;
- doors onto the deck that no longer line up with the deck height;
- gaps opening where the deck meets the house;
- stairs that rock or have uneven steps.
The aim is footings that suit the site class, and a site layout that keeps the moisture around the footings as steady as practical.
How deck footings are sized
The NCC has no deck-specific framing clause. Deck bearers, joists and posts are normally sized from AS 1684 span tables or by an engineer, and NCC Volume Two H1D6(4) accepts timber framing designed to AS 1720.1 or AS 1684.2 or 1684.4. Footings are set out to carry those posts for the site's soil.
Where the site or the design calls for it, an engineer specifies the footings. Addan is a licensed carpenter, not an engineer. "We sort council and engineering" means he arranges the engineer and builds to their design. Under the carpentry licence scope in Home Building Regulation 2014 Schedule 4, footings for outdoor structures such as pergolas and timber decks are carpentry work.
Posts and timber near the ground
The timber choices at ground level matter as much as the footing. From WoodSolutions Technical Design Guide 21 (TDG 21):
| Location | Minimum timber |
|---|---|
| Posts embedded in the ground | In-ground Class 1 hardwood, or treated to H5 |
| Framing within 150 mm of the ground | In-ground Class 1 hardwood, or treated to at least H4 |
| Deck boards and framing above ground | Above-ground Class 1 or 2 hardwood (sapwood removed or H3 treated), or treated to at least H3 |
H3 treated pine must not go in the ground. Posts can also sit on steel stirrups set in the footing, which keeps the timber off the ground. Where the house has a termite barrier, TDG 21 describes posts on stirrups needing at least 75 mm clearance above the ground or paving for inspection. See termites and decks.
Low decks on clay
Low decks are the hardest on timber. TDG 21 says decks under 400 mm off the ground need narrower boards and a long-term board gap of 5 mm to 6 mm, plus extra ventilation, drainage and inspection access. Ground that drains away from under the deck, and open sides for air flow, are part of meeting that.
Drainage around footings
Keeping water away from footings reduces the moisture swings in the clay. At the quote, Addan looks at:
- where roofwater and downpipes discharge;
- whether the ground under the deck falls away from the house;
- garden beds and sprinklers near the footings;
- whether the deck will interfere with existing drainage paths.
A deck built as exempt development must not interfere with existing drainage fixtures or flow paths (Codes SEPP s 2.12(1)(m)). Stormwater and downpipe changes are plumbing work for a licensed plumber.
Dial before you dig
Before footing holes are dug, check for underground services. Before You Dig Australia (BYDA) is free. Lodge online at byda.com.au or call 1100 during business hours. BYDA advises lodging at least one day before work starts, and asset owners are encouraged to respond within 2 business days. Under the Inland Code, complying development must not be over a registered easement or within 1 m of a public water or sewer main.
Existing decks that have moved
If your deck has dropped or tilted, look under it for posts that have sunk, rotted at ground level or lifted off their stirrups. Warning signs listed by the Queensland Government include soft or spongy timber, rusted or broken post brackets, and movement under load. Re-levelling a deck or replacing posts and footings is structural work for a licensed builder. See signs your deck needs repair and our deck repairs.
Footings and the price
Height off the ground, slope and the soil all shape the footing design on a raised deck or any deck, and that affects the cost. The instant estimate gives a starting figure, and Addan confirms the footing design at the free on-site quote.
Common questions
What soil type is common in Wagga Wagga?
A Wagga engineering firm has written that M and M-D, moderately reactive clay, are the most common site classes in the Wagga Wagga area, because of red clay soils and high evaporation. Your own lot may be different.
How deep should deck footings be on clay?
It depends on the site class, the deck height and the loads. Footings are set from the relevant standard or by an engineer for the site, so there is no single depth that suits every block.
Can treated pine posts go in the ground?
Only if treated to H5, or use in-ground Class 1 hardwood. H3 treated pine must not go in the ground, and framing within 150 mm of the ground should be at least H4.
Do I need an engineer for deck footings?
Not for every deck. Deck framing is normally sized from AS 1684 span tables or by an engineer. Where the site or the design needs an engineer, Addan arranges one.
Why has my deck become uneven?
Possible causes include footings moving with the clay, posts rotting at ground level, or rusted stirrups. Have it checked by a licensed builder before it gets worse.